Upload your budget-vs-actual export, map line item, budget, and actual: get the dollar and percentage variance for every line, an over/under/on-budget flag, and the biggest swings ranked by impact. Free.
We email you the report link.
Free up to 10,000 rows. Encrypted in transit.
Computing budget-vs-actual variance by line item...
For every line item the analysis sums the budget and the actual (handling repeated rows), then computes the dollar variance (actual minus budget) and the percentage variance against the budgeted amount. Each line is classified as over budget, under budget, or on budget when it falls within plus or minus 1% of plan. Lines are ranked by the absolute size of their dollar swing, and each line's share of the total absolute variance shows where the money actually moved.
Use it whenever you have a budget and matching actuals by line item: the monthly or quarterly close, a departmental spend review, or any plan-vs-actual comparison.
Not for a single blended total with no line items, and not a forecast or a driver-based variance bridge. It explains the period that happened, not the one ahead.
Built for: Finance, FP&A, and operators reviewing budget performance by line item
Typical data source: A budget-vs-actual export from the GL, ERP, or a spreadsheet with line item, budget, and actual columns
A budget-vs-actual table, one row per line item. For example, a departmental expense budget:
Minimum 3 rows · Best with 10-300 line items across a budget period
Standard-library analysis: the core FP&A variance report straight from a budget-vs-actual table. Map a line item (account, category, or department), its budgeted amount, and its actual amount, and get the dollar variance and percentage variance for every line, each classified as over / under / on budget, the biggest swings ranked by dollar impact, and each line's contribution to the total variance. Whether a swing is favorable depends on whether the line is revenue-like or cost-like, so the report stays neutral and reports direction and size. You make the favorability call.
The largest signed dollar swings at a glance: right of zero is over budget, left is under.
Every line item with its budget, actual, dollar and percentage variance, and over/under/on-budget status.
The handful of line items that drove most of the total variance, ranked by dollar impact with their contribution share.
Plain-English reading of the results and what to do next.
Where did we miss the budget, and by how much?
Upload your budget-vs-actual export and map line item, budget, and actual. Every line gets its dollar and percentage variance and an over/under/on-budget flag, and the biggest swings are ranked so the review starts with the lines that matter.
See our FAQ for pricing, privacy and how the analysis works.
MCP Analytics. Budget vs Actual (Variance Analysis). Free tool. https://mcpanalytics.ai/free/standard_variance_analysis. Accessed [date you used it].
Your turn
Bring your own data and the question you actually need answered.
MCP AnalyticsData science by email Send us your data and your question, and we will reply. ds@mcpanalytics.ai
Tell us what went wrong, in your own words. We capture the page you're on automatically, so no need to describe where you are.